Renewable sites › Garlaff Landfill (Extension)
Garlaff Landfill (Extension)
Garlaff Landfill (Extension) is an operational 3 MW landfill gas site in East Ayrshire, generating since 29 December 2003. Planning permission was granted on 18 December 2003, 4 months after submission. Operator of record: Garlaff Energy Ltd.
Planning and build timeline
| Application submitted | 13 August 2003 |
| Permission granted | 18 December 2003 4 months after submission |
| Operational | 29 December 2003 0 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in East Ayrshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Garlaff Landfill (Extension)’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.3 | 0 km |
Battery · Under Construction | 50 | 6.9 km |
Wind Onshore · Under Construction | 81 | 7.7 km |
Wind Onshore · Under Construction | 70 | 9.3 km |
Wind Onshore · Under Construction | 205.8 | 9.4 km |
Wind Onshore · Operational | 240 | 12.5 km |
Wind Onshore · Operational | 13.2 | 13.5 km |
Wind Onshore · Operational | 29.8 | 13.5 km |
How big is Garlaff Landfill (Extension)?
Garlaff Landfill (Extension) has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Garlaff Landfill (Extension)?
REPD records the operator as Garlaff Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Garlaff Landfill (Extension) approved and built?
The application was submitted on 13 August 2003. Permission was granted on 18 December 2003, 4 months later. The site became operational on 29 December 2003, 0 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 671.