Novarly ParcelRenewable sites

Renewable sitesGarlaff Landfill (Extension)

Garlaff Landfill (Extension)

Garlaff Landfill (Extension) is an operational 3 MW landfill gas site in East Ayrshire, generating since 29 December 2003. Planning permission was granted on 18 December 2003, 4 months after submission. Operator of record: Garlaff Energy Ltd.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 29 December 2003
Landfill Gas
Technology
Garlaff Energy Ltd
East Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted13 August 2003
Permission granted18 December 2003
4 months after submission
Operational29 December 2003
0 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in East Ayrshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Garlaff Landfill (Extension)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.30 km
Battery · Under Construction
506.9 km
Wind Onshore · Under Construction
817.7 km
Wind Onshore · Under Construction
709.3 km
Wind Onshore · Under Construction
205.89.4 km
Wind Onshore · Operational
24012.5 km
Wind Onshore · Operational
13.213.5 km
Wind Onshore · Operational
29.813.5 km

How big is Garlaff Landfill (Extension)?

Garlaff Landfill (Extension) has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Garlaff Landfill (Extension)?

REPD records the operator as Garlaff Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Garlaff Landfill (Extension) approved and built?

The application was submitted on 13 August 2003. Permission was granted on 18 December 2003, 4 months later. The site became operational on 29 December 2003, 0 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 671.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode