Renewable sites › Garlaff Landfill
Garlaff Landfill
Garlaff Landfill is an operational 1.3 MW landfill gas site in East Ayrshire, generating since 29 December 2003. Planning permission was granted on 13 June 2002, 3 months after submission. Operator of record: Barr Environmental / CLP.
Planning and build timeline
| Application submitted | 18 March 2002 |
| Permission granted | 13 June 2002 3 months after submission |
| Operational | 29 December 2003 19 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in East Ayrshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Garlaff Landfill’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 3 | 0 km |
Battery · Under Construction | 50 | 6.9 km |
Wind Onshore · Under Construction | 81 | 7.7 km |
Wind Onshore · Under Construction | 70 | 9.3 km |
Wind Onshore · Under Construction | 205.8 | 9.4 km |
Wind Onshore · Operational | 240 | 12.5 km |
Wind Onshore · Operational | 13.2 | 13.5 km |
Wind Onshore · Operational | 29.8 | 13.5 km |
How big is Garlaff Landfill?
Garlaff Landfill has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Garlaff Landfill?
REPD records the operator as Barr Environmental / CLP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Garlaff Landfill approved and built?
The application was submitted on 18 March 2002. Permission was granted on 13 June 2002, 3 months later. The site became operational on 29 December 2003, 19 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 690.