North Red Bog

North Red Bog is an operational 1.6 MW onshore wind farm in Aberdeenshire, generating since 23 June 2008. Planning permission was granted on 7 March 2008, 8 months after submission. Operator of record: Green Cat Renewables.

1.6 MW
Capacity
as recorded in REPD
Operational
Status
since 23 June 2008
Wind Onshore
Technology
Green Cat Renewables
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted6 July 2007
Permission granted7 March 2008
8 months after submission
Operational23 June 2008
4 months after consent

Screening a site of your own?

RedlineUK · £39

Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with North Red Bog’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.64.3 km
Wind Onshore · Operational
54.3 km
Wind Onshore · Operational
2.44.6 km
Solar Photovoltaics · Under Construction
36.65.8 km
Battery · Under Construction
405.8 km
Wind Onshore · Operational
66.1 km
Wind Onshore · Operational
9.26.6 km
Solar Photovoltaics · Under Construction
210.2 km

How big is North Red Bog?

North Red Bog has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates North Red Bog?

REPD records the operator as Green Cat Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was North Red Bog approved and built?

The application was submitted on 6 July 2007. Permission was granted on 7 March 2008, 8 months later. The site became operational on 23 June 2008, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2965.