Land at Overside and Greenwellheads Farms is operational in Aberdeenshire with a recorded capacity of 9.2 MW, and has been generating since 2013-11-01.

9.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-11-01
Wind Onshore
Technology
Greenside Wind Energy Ltd
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted2011-03-30
Permission granted2011-09-13
5 months after submission
Operational2013-11-01
26 months after consent

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Bilbo Solar Farm
Solar Photovoltaics · Under Construction
36.61.1 km
Bilbo Solar Farm Energy Storage
Battery · Under Construction
401.1 km
St Fergus Moss Wind Farm
Wind Onshore · Operational
61.3 km
St Fergus Renewable Energy Park
Battery · Under Construction
3.9 km
St Fergus Renewable Energy Park
Wind Onshore · Under Construction
33.9 km
St Fergus Renewable Energy Park
Solar Photovoltaics · Under Construction
53.9 km
Bruxiehall Farm
Solar Photovoltaics · Under Construction
24.5 km
North Red Bog
Wind Onshore · Operational
1.66.6 km

How big is Land at Overside and Greenwellheads Farms?

Land at Overside and Greenwellheads Farms has a recorded installed capacity of 9.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Overside and Greenwellheads Farms?

REPD records the operator as Greenside Wind Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Overside and Greenwellheads Farms approved and built?

The application was submitted on 2011-03-30. Permission was granted on 2011-09-13, 5 months later. The site became operational on 2013-11-01, 26 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3802.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council