Renewable sites › House O�Hill Solar Farm
House O�Hill Solar Farm
House O�Hill Solar Farm is operational in Aberdeenshire with a recorded capacity of 1.6 MW, and has been generating since 2015-12-01.
Planning and build timeline
| Application submitted | 2014-11-06 |
| Permission granted | 2015-01-28 3 months after submission |
| Operational | 2015-12-01 10 months after consent |
Aberdeenshire’s record on solar
Aberdeenshire has decided 39 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
House O'Hill Wind Onshore · Operational | 5 | 0.1 km |
Mains of Hatton Wind Onshore · Operational | 2.4 | 1.6 km |
North Red Bog Wind Onshore · Operational | 1.6 | 4.3 km |
Wastewater Treatment Works, Fraserburgh Solar Photovoltaics · Under Construction | 1.03 | 7.7 km |
Bilbo Solar Farm Solar Photovoltaics · Under Construction | 36.6 | 8.6 km |
Bilbo Solar Farm Energy Storage Battery · Under Construction | 40 | 8.6 km |
St Fergus Moss Wind Farm Wind Onshore · Operational | 6 | 9.6 km |
Land at Overside and Greenwellheads Farms Wind Onshore · Operational | 9.2 | 9.6 km |
How big is House O�Hill Solar Farm?
House O�Hill Solar Farm has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates House O�Hill Solar Farm?
REPD records the operator as House O'Hill Wind Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was House O�Hill Solar Farm approved and built?
The application was submitted on 2014-11-06. Permission was granted on 2015-01-28, 3 months later. The site became operational on 2015-12-01, 10 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4753.