Novarly ParcelRenewable sites

Renewable sitesLodge Farm (Poulshot)

Lodge Farm (Poulshot)

Lodge Farm (Poulshot) is an operational 14.5 MW solar farm in Wiltshire, generating since 31 March 2015. Planning permission was granted on 27 February 2014, 4 months after submission. Operator of record: Hive Energy.

14.5 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2015
Solar Photovoltaics
Technology
Hive Energy
Wiltshire
Authority
England

Planning and build timeline

Application submitted23 October 2013
Permission granted27 February 2014
4 months after submission
Operational31 March 2015
13 months after consent

Screening a site of your own?

RedlineUK · £39

Wiltshire approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lodge Farm (Poulshot)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Battery · Operational
503.7 km
Battery · Operational
503.7 km
Battery · Operational
503.7 km
Solar Photovoltaics · Operational
53.9 km
Battery · Operational
49.994 km
Solar Photovoltaics · Operational
144.1 km
Solar Photovoltaics · Operational
7.24.3 km
Battery · Operational
49.994.8 km

How big is Lodge Farm (Poulshot)?

Lodge Farm (Poulshot) has a recorded installed capacity of 14.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lodge Farm (Poulshot)?

REPD records the operator as Hive Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lodge Farm (Poulshot) approved and built?

The application was submitted on 23 October 2013. Permission was granted on 27 February 2014, 4 months later. The site became operational on 31 March 2015, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2351.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode