Novarly ParcelRenewable sites

Renewable sitesMilton of Fisherie Wind Cluster

Milton of Fisherie Wind Cluster

Milton of Fisherie Wind Cluster is an operational 4.6 MW onshore wind farm in Aberdeenshire, generating since 1 February 2016. Planning permission was granted on 2 November 2012, 17 months after submission. Operator of record: LocoGen.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1 February 2016
Wind Onshore
Technology
LocoGen
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted25 May 2011
Permission granted2 November 2012
17 months after submission
Operational1 February 2016
39 months after consent

Screening a site of your own?

RedlineUK · £39

Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Milton of Fisherie Wind Cluster’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2.33 km
Wind Onshore · Operational
4.63.7 km
Wind Onshore · Operational
1.54.5 km
Solar Photovoltaics · Operational
2.47.2 km
Wind Onshore · Operational
4.57.9 km
Wind Onshore · Operational
2.39.3 km
Wind Onshore · Operational
4.69.7 km
Wind Onshore · Operational
2.39.7 km

How big is Milton of Fisherie Wind Cluster?

Milton of Fisherie Wind Cluster has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Milton of Fisherie Wind Cluster?

REPD records the operator as LocoGen. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Milton of Fisherie Wind Cluster approved and built?

The application was submitted on 25 May 2011. Permission was granted on 2 November 2012, 17 months later. The site became operational on 1 February 2016, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3809.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode