Novarly ParcelRenewable sites

Renewable sitesMillerhill AD (Waste AD)

Millerhill AD (Waste AD)

Millerhill AD (Waste AD) is operational in Midlothian with a recorded capacity of 1.5 MW, and has been generating since 2016-12-01.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-12-01
Anaerobic Digestion
Technology
Ancala Bioenergy (formerly Biogen/Aluana Renewable Energy)
Midlothian
Authority
Scotland

Planning and build timeline

Application submitted2013-01-25
Permission granted2013-05-31
4 months after submission
Operational2016-12-01
42 months after consent

Other built sites within 15 km

SiteMWDistance
Millerhill EfW
EfW Incineration · Operational
12.50.2 km
Drummond Moor Landfill
Landfill Gas · Operational
24.8 km
Bonnyrigg
Landfill Gas · Operational
2.25.1 km
City of Edinburgh Council Buildings
Solar Photovoltaics · Operational
0.26.9 km
Oatslie Landfill Gas
Landfill Gas · Operational
29.3 km
Easter Bush
Solar Photovoltaics · Under Construction
39.5 km

How big is Millerhill AD (Waste AD)?

Millerhill AD (Waste AD) has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Millerhill AD (Waste AD)?

REPD records the operator as Ancala Bioenergy (formerly Biogen/Aluana Renewable Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Millerhill AD (Waste AD) approved and built?

The application was submitted on 2013-01-25. Permission was granted on 2013-05-31, 4 months later. The site became operational on 2016-12-01, 42 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 371.