Novarly ParcelRenewable sites

Renewable sitesMethlick Farmers Wind Energy Project

Methlick Farmers Wind Energy Project

Methlick Farmers Wind Energy Project is an operational 12 MW onshore wind farm in Aberdeenshire, generating since 1 December 2011. Planning permission was granted on 1 July 2007, 9 months after submission. Operator of record: Orkney Sustainable Energy.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2011
Wind Onshore
Technology
Orkney Sustainable Energy
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted1 October 2006
Permission granted1 July 2007
9 months after submission
Operational1 December 2011
53 months after consent

Screening a site of your own?

RedlineUK · £39

Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Methlick Farmers Wind Energy Project’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
3.23.3 km
Wind Onshore · Operational
4.63.9 km
Wind Onshore · Operational
2.34.1 km
Wind Onshore · Operational
2.44.9 km
Wind Onshore · Operational
1.75 km
Wind Onshore · Operational
6.95.5 km
Wind Onshore · Operational
3.25.6 km
Wind Onshore · Operational
2.36.2 km

How big is Methlick Farmers Wind Energy Project?

Methlick Farmers Wind Energy Project has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Methlick Farmers Wind Energy Project?

REPD records the operator as Orkney Sustainable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Methlick Farmers Wind Energy Project approved and built?

The application was submitted on 1 October 2006. Permission was granted on 1 July 2007, 9 months later. The site became operational on 1 December 2011, 53 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3548.