Stonebarrow Farm is an operational 8 MW solar farm in East Devon, generating since 30 January 2014. Planning permission was granted on 19 April 2013, 5 months after submission. Operator of record: British Solar Renewables (formerly known as Solar Power Generation).

8 MW
Capacity
as recorded in REPD
Operational
Status
since 30 January 2014
Solar Photovoltaics
Technology
British Solar Renewables (formerly known as Solar Power Generation)
East Devon
Authority
England

Planning and build timeline

Application submitted9 November 2012
Permission granted19 April 2013
5 months after submission
Operational30 January 2014
9 months after consent

Screening a site of your own?

RedlineUK · £39

East Devon approves 87% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Stonebarrow Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Devon’s record on solar

East Devon has decided 31 solar farms and approved 87%, taking a median of 4.5 months. See every solar farm decision in East Devon

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
40.6 km
Solar Photovoltaics · Operational
4.81 km
Solar Photovoltaics · Under Construction
18.92.2 km
Solar Photovoltaics · Operational
52.3 km
Solar Photovoltaics · Operational
53.8 km
Solar Photovoltaics · Operational
1.86.1 km
Battery · Operational
8.86.2 km
Solar Photovoltaics · Operational
29.9 km

How big is Stonebarrow Farm?

Stonebarrow Farm has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stonebarrow Farm?

REPD records the operator as British Solar Renewables (formerly known as Solar Power Generation). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stonebarrow Farm approved and built?

The application was submitted on 9 November 2012. Permission was granted on 19 April 2013, 5 months later. The site became operational on 30 January 2014, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2064.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode