PARK WOOD SOLAR FARM
PARK WOOD SOLAR FARM is an operational 5 MW solar farm in Somerset, generating since 29 September 2011. Planning permission was granted on 28 July 2011, 3 months after submission. Operator of record: Solar Power Generation Limited.
Planning and build timeline
| Application submitted | 4 May 2011 |
| Permission granted | 28 July 2011 3 months after submission |
| Operational | 29 September 2011 2 months after consent |
Screening a site of your own?
Somerset approves 86% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with PARK WOOD SOLAR FARM’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
- Nutrient-neutrality catchment — Brue Catchment
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Somerset’s record on solar
Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1.5 | 3.3 km |
Battery · Operational | 0.3 | 3.3 km |
Solar Photovoltaics · Operational | 5 | 3.4 km |
Solar Photovoltaics · Operational | 1 | 4.5 km |
Solar Photovoltaics · Operational | 0.3 | 6.1 km |
Solar Photovoltaics · Operational | 8.7 | 7.3 km |
Solar Photovoltaics · Operational | 3.5 | 8.2 km |
Anaerobic Digestion · Operational | 3 | 8.6 km |
How big is PARK WOOD SOLAR FARM?
PARK WOOD SOLAR FARM has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates PARK WOOD SOLAR FARM?
REPD records the operator as Solar Power Generation Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was PARK WOOD SOLAR FARM approved and built?
The application was submitted on 4 May 2011. Permission was granted on 28 July 2011, 3 months later. The site became operational on 29 September 2011, 2 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1076.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode