Higher Hill Farm Energy Storage

Higher Hill Farm Energy Storage is an operational 0.3 MW battery storage site in Somerset, generating since 12 September 2016. REPD does not record the planning grant date. Operator of record: British Solar Renewables / Western Power Distribution / RES.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 12 September 2016
Battery
Technology
British Solar Renewables / Western Power Distribution / RES
Somerset
Authority
England

Planning and build timeline

Application submitted28 March 2011
Permission grantednot recorded
Operational12 September 2016

Screening a site of your own?

RedlineUK · £39

Somerset approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Higher Hill Farm Energy Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on battery storage

Somerset has decided 23 battery storage schemes and approved 100%, taking a median of 7.2 months. See every battery storage scheme decision in Somerset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.50 km
Solar Photovoltaics · Operational
50.6 km
Solar Photovoltaics · Operational
53.3 km
Solar Photovoltaics · Operational
0.34 km
Solar Photovoltaics · Operational
14 km
Solar Photovoltaics · Operational
8.74.5 km
Solar Photovoltaics · Operational
3.67.9 km
Solar Photovoltaics · Operational
3.58.3 km

How big is Higher Hill Farm Energy Storage?

Higher Hill Farm Energy Storage has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Higher Hill Farm Energy Storage?

REPD records the operator as British Solar Renewables / Western Power Distribution / RES. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Higher Hill Farm Energy Storage approved and built?

The application was submitted on 28 March 2011. REPD does not record a grant date. The site became operational on 12 September 2016.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6881.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode