Solar farm at land at The Willows, Uttoxeter is operational in East Staffordshire with a recorded capacity of 6.4 MW, and has been generating since 2017-03-31.

6.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-31
Solar Photovoltaics
Technology
TGC Renewables
East Staffordshire
Authority
England

Planning and build timeline

Application submitted2015-04-15
Permission granted2015-07-24
3 months after submission
Operational2017-03-31
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Staffordshire’s record on solar

East Staffordshire has decided 17 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in East Staffordshire

Other built sites within 15 km

SiteMWDistance
Marchington Solar Farm
Solar Photovoltaics · Operational
4.32.1 km
Holtwood Farm
Solar Photovoltaics · Operational
52.4 km
Somersal Mill Farm
Solar Photovoltaics · Operational
2.63.8 km
Land of Green Lane
Solar Photovoltaics · Operational
5.84.6 km
Morton House (Marchington)
Solar Photovoltaics · Operational
6.25 km
Woodhouse Fields Farm
Solar Photovoltaics · Operational
56.2 km
Aston House Solar Farm
Solar Photovoltaics · Operational
206.7 km
Hawthorn Farm - Solar photovoltaic panels
Solar Photovoltaics · Under Construction
109.4 km

How big is Solar farm at land at The Willows, Uttoxeter?

Solar farm at land at The Willows, Uttoxeter has a recorded installed capacity of 6.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Solar farm at land at The Willows, Uttoxeter?

REPD records the operator as TGC Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Solar farm at land at The Willows, Uttoxeter approved and built?

The application was submitted on 2015-04-15. Permission was granted on 2015-07-24, 3 months later. The site became operational on 2017-03-31, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5241.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council