Novarly ParcelRenewable sites

Renewable sitesSolar farm at land at The Willows, Uttoxeter

Solar farm at land at The Willows, Uttoxeter

Solar farm at land at The Willows, Uttoxeter is an operational 6.4 MW solar farm in East Staffordshire, generating since 31 March 2017. Planning permission was granted on 24 July 2015, 3 months after submission. Operator of record: TGC Renewables.

6.4 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2017
Solar Photovoltaics
Technology
TGC Renewables
East Staffordshire
Authority
England

Planning and build timeline

Application submitted15 April 2015
Permission granted24 July 2015
3 months after submission
Operational31 March 2017
20 months after consent

Screening a site of your own?

RedlineUK · £39

East Staffordshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Solar farm at land at The Willows, Uttoxeter’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Staffordshire’s record on solar

East Staffordshire has decided 17 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in East Staffordshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.32.1 km
Solar Photovoltaics · Operational
52.4 km
Solar Photovoltaics · Operational
2.63.8 km
Solar Photovoltaics · Operational
5.84.6 km
Solar Photovoltaics · Operational
6.25 km
Solar Photovoltaics · Operational
56.2 km
Solar Photovoltaics · Operational
206.7 km
Solar Photovoltaics · Under Construction
109.4 km

How big is Solar farm at land at The Willows, Uttoxeter?

Solar farm at land at The Willows, Uttoxeter has a recorded installed capacity of 6.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Solar farm at land at The Willows, Uttoxeter?

REPD records the operator as TGC Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Solar farm at land at The Willows, Uttoxeter approved and built?

The application was submitted on 15 April 2015. Permission was granted on 24 July 2015, 3 months later. The site became operational on 31 March 2017, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5241.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode