Moneystone Quarry Solar Farm
Moneystone Quarry Solar Farm is operational in Staffordshire Moorlands with a recorded capacity of 5 MW, and has been generating since 2016-11-21.
Planning and build timeline
| Application submitted | 2015-04-15 |
| Permission granted | 2015-07-22 3 months after submission |
| Operational | 2016-11-21 16 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Staffordshire Moorlands’s record on solar
Staffordshire Moorlands has decided 12 solar farms and approved 92%, taking a median of 5.9 months. See every solar farm decision in Staffordshire Moorlands →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Woodhouse Fields Farm Solar Photovoltaics · Operational | 5 | 8.3 km |
Land at Heywood Grange Solar Photovoltaics · Operational | 8.4 | 8.7 km |
Lower Newton Farm Solar Photovoltaics · Operational | 11.5 | 9.4 km |
Somersal Mill Farm Solar Photovoltaics · Operational | 2.6 | 14.3 km |
Solar farm at land at The Willows, Uttoxeter Solar Photovoltaics · Operational | 6.4 | 14.5 km |
How big is Moneystone Quarry Solar Farm?
Moneystone Quarry Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Moneystone Quarry Solar Farm?
REPD records the operator as SBC Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Moneystone Quarry Solar Farm approved and built?
The application was submitted on 2015-04-15. Permission was granted on 2015-07-22, 3 months later. The site became operational on 2016-11-21, 16 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5229.