Novarly ParcelRenewable sites

Renewable sitesLochaber High School (Resubmission)

Lochaber High School (Resubmission)

Lochaber High School (Resubmission) is an operational 0.3 MW solar farm in Highland, generating since 1 December 2019. Planning permission was granted on 16 August 2019, 2 months after submission. Operator of record: Highland Council.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2019
Solar Photovoltaics
Technology
Highland Council
Highland
Authority
Scotland

Planning and build timeline

Application submitted13 June 2019
Permission granted16 August 2019
2 months after submission
Operational1 December 2019
4 months after consent

Screening a site of your own?

RedlineUK · £39

Highland approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lochaber High School (Resubmission)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Highland’s record on solar

Highland has decided 13 solar farms and approved 100%, taking a median of 2 months. See every solar farm decision in Highland

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
1.90.5 km
Large Hydro · Operational
650.9 km
Small Hydro · Operational
1.18.2 km
Small Hydro · Operational
210 km
Small Hydro · Operational
313.7 km

How big is Lochaber High School (Resubmission)?

Lochaber High School (Resubmission) has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lochaber High School (Resubmission)?

REPD records the operator as Highland Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lochaber High School (Resubmission) approved and built?

The application was submitted on 13 June 2019. Permission was granted on 16 August 2019, 2 months later. The site became operational on 1 December 2019, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7281.

Novarly Parcel · official public data, read properly · parcel.novarly.com