Cia Aig Hydro is operational in Scottish Government (S36) with a recorded capacity of 3 MW, and has been generating since 2016-08-24.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-08-24
Small Hydro
Technology
RWE Npower Renewables
Scottish Government (S36)
Authority
Scotland

Planning and build timeline

Application submitted2009-09-04
Permission granted2010-06-26
10 months after submission
Operational2016-08-24
74 months after consent

Other built sites within 15 km

SiteMWDistance
Mucomir
Small Hydro · Operational
25 km
Allt Cheanna Mhuir Hydro
Small Hydro · Operational
1.37.2 km
Allt Garaidh Ghualaich Hydro Scheme Powerhouse
Small Hydro · Under Construction
1.110.2 km
Nevis Range
Small Hydro · Operational
1.112.5 km
Allt Ladaidh Hydro
Small Hydro · Operational
1.312.9 km
Lochaber High School (Resubmission)
Solar Photovoltaics · Operational
0.313.7 km
Derrydarroch
Small Hydro · Operational
1.914.2 km
Lochaber
Large Hydro · Operational
6514.4 km

How big is Cia Aig Hydro?

Cia Aig Hydro has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cia Aig Hydro?

REPD records the operator as RWE Npower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cia Aig Hydro approved and built?

The application was submitted on 2009-09-04. Permission was granted on 2010-06-26, 10 months later. The site became operational on 2016-08-24, 74 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 475.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council