Lochaber

Lochaber is an operational 65 MW hydro scheme in Scotland, generating since 1 January 1929. REPD does not record the planning grant date. Operator of record: GFG Alliance.

65 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 1929
Large Hydro
Technology
GFG Alliance
National
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 January 1929

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lochaber’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
1.90.6 km
Solar Photovoltaics · Operational
0.30.9 km
Small Hydro · Operational
1.18 km
Small Hydro · Operational
210.5 km
Large Hydro · Operational
19.514.4 km
Small Hydro · Operational
314.4 km
Small Hydro · Operational
214.6 km

How big is Lochaber?

Lochaber has a recorded installed capacity of 65 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lochaber?

REPD records the operator as GFG Alliance. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lochaber approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 January 1929.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6601.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode