Renewable sites › Limebar Lane - Energy Distribution Centre
Limebar Lane - Energy Distribution Centre
Limebar Lane - Energy Distribution Centre is under construction in North Yorkshire.
Planning and build timeline
| Application submitted | 2021-01-21 |
| Permission granted | 2022-08-30 19 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Yorkshire’s record on solar
North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Allerton Waste Recovery Park (Waste AD) Anaerobic Digestion · Operational | 1.1 | 3 km |
Allerton Waste Recovery Park (EfW) EfW Incineration · Operational | 27 | 3 km |
Wormald Green - Battery Energy Storage System Battery · Operational | 33 | 9.1 km |
Cold Harbour Farm Solar Photovoltaics · Operational | 5 | 13.1 km |
York Solar Farm Solar Photovoltaics · Operational | 34.7 | 14 km |
Boscar Grange Farm Battery · Operational | 27 | 14 km |
Land South of Highfield House Solar Photovoltaics · Operational | 5 | 14.1 km |
Barugh Farm Solar Photovoltaics · Operational | 5 | 14.7 km |
How big is Limebar Lane - Energy Distribution Centre?
REPD does not record an installed capacity for Limebar Lane - Energy Distribution Centre.
Who operates Limebar Lane - Energy Distribution Centre?
REPD records the operator as Northern Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Limebar Lane - Energy Distribution Centre approved and built?
The application was submitted on 2021-01-21. Permission was granted on 2022-08-30, 19 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8827.
Novarly Parcel · official public data, read properly · parcel.novarly.com