Novarly ParcelRenewable sites

Renewable sitesAllerton Waste Recovery Park (Waste AD)

Allerton Waste Recovery Park (Waste AD)

Allerton Waste Recovery Park (Waste AD) is an operational 1.1 MW anaerobic digestion plant in North Yorkshire, generating since 4 March 2018. Planning permission was granted on 1 October 2012, 12 months after submission. Operator of record: AmeyCespa.

1.1 MW
Capacity
as recorded in REPD
Operational
Status
since 4 March 2018
Anaerobic Digestion
Technology
AmeyCespa
North Yorkshire
Authority
England

Planning and build timeline

Application submitted12 October 2011
Permission granted1 October 2012
12 months after submission
Operational4 March 2018
65 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Yorkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Allerton Waste Recovery Park (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
270 km
Solar Photovoltaics · Under Construction
3 km
Battery · Operational
3310.5 km

How big is Allerton Waste Recovery Park (Waste AD)?

Allerton Waste Recovery Park (Waste AD) has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Allerton Waste Recovery Park (Waste AD)?

REPD records the operator as AmeyCespa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Allerton Waste Recovery Park (Waste AD) approved and built?

The application was submitted on 12 October 2011. Permission was granted on 1 October 2012, 12 months later. The site became operational on 4 March 2018, 65 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 368.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode