Wormald Green - Battery Energy Storage System
Wormald Green - Battery Energy Storage System is operational in North Yorkshire with a recorded capacity of 33 MW, and has been generating since 2024-09-11.
Planning and build timeline
| Application submitted | 2022-03-17 |
| Permission granted | 2022-06-14 3 months after submission |
| Operational | 2024-09-11 27 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Yorkshire’s record on battery storage
North Yorkshire has decided 29 battery storage schemes and approved 100%, taking a median of 10.5 months. See every battery storage scheme decision in North Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Limebar Lane - Energy Distribution Centre Solar Photovoltaics · Under Construction | — | 9.1 km |
Allerton Waste Recovery Park (Waste AD) Anaerobic Digestion · Operational | 1.1 | 10.5 km |
Allerton Waste Recovery Park (EfW) EfW Incineration · Operational | 27 | 10.5 km |
Barugh Farm Solar Photovoltaics · Operational | 5 | 11.3 km |
Knabs Ridge Windfarm Wind Onshore · Operational | 16 | 11.8 km |
How big is Wormald Green - Battery Energy Storage System?
Wormald Green - Battery Energy Storage System has a recorded installed capacity of 33 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Wormald Green - Battery Energy Storage System?
REPD records the operator as Harmony Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Wormald Green - Battery Energy Storage System approved and built?
The application was submitted on 2022-03-17. Permission was granted on 2022-06-14, 3 months later. The site became operational on 2024-09-11, 27 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10893.