Renewable sites › Boscar Grange Farm
Boscar Grange Farm
Boscar Grange Farm is operational in North Yorkshire with a recorded capacity of 27 MW, and has been generating since 2019-12-18.
Planning and build timeline
| Application submitted | 2018-10-29 |
| Permission granted | not recorded |
| Operational | 2019-12-18 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Yorkshire’s record on battery storage
North Yorkshire has decided 29 battery storage schemes and approved 100%, taking a median of 10.5 months. See every battery storage scheme decision in North Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
York Solar Farm Solar Photovoltaics · Operational | 34.7 | 0 km |
Land South of Highfield House Solar Photovoltaics · Operational | 5 | 0.5 km |
Cold Harbour Farm Solar Photovoltaics · Operational | 5 | 6.4 km |
Mill Hill Farm Solar Photovoltaics · Operational | 5 | 13.9 km |
Limebar Lane - Energy Distribution Centre Solar Photovoltaics · Under Construction | — | 14 km |
How big is Boscar Grange Farm?
Boscar Grange Farm has a recorded installed capacity of 27 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Boscar Grange Farm?
REPD records the operator as Gridserve. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Boscar Grange Farm approved and built?
The application was submitted on 2018-10-29. REPD does not record a grant date. The site became operational on 2019-12-18.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7332.
Novarly Parcel · official public data, read properly · parcel.novarly.com