Novarly ParcelRenewable sites

Renewable sitesKings Barn Farm - Energy Barn

Kings Barn Farm - Energy Barn

Kings Barn Farm - Energy Barn is an operational 10 MW battery storage site in Horsham, generating since 31 March 2017. REPD does not record the planning grant date. Operator of record: Anesco/ Green Hedge Energy UK.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2017
Battery
Technology
Anesco/ Green Hedge Energy UK
Horsham
Authority
England

Planning and build timeline

Application submitted22 July 2016
Permission grantednot recorded
Operational31 March 2017

Screening a site of your own?

RedlineUK · £39

Horsham approves 80% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kings Barn Farm - Energy Barn’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Horsham’s record on battery storage

Horsham has decided 5 battery storage schemes and approved 80%, taking a median of 6.1 months. See every battery storage scheme decision in Horsham

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
22.3 km
Battery · Under Construction
49.994.9 km
Solar Photovoltaics · Operational
105.9 km
Solar Photovoltaics · Operational
7.66.5 km
Solar Photovoltaics · Operational
58.5 km
Solar Photovoltaics · Operational
1.89.9 km
Solar Photovoltaics · Operational
514.3 km

How big is Kings Barn Farm - Energy Barn?

Kings Barn Farm - Energy Barn has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kings Barn Farm - Energy Barn?

REPD records the operator as Anesco/ Green Hedge Energy UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kings Barn Farm - Energy Barn approved and built?

The application was submitted on 22 July 2016. REPD does not record a grant date. The site became operational on 31 March 2017.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6916.