Land At Ferry Farm is operational in Chichester with a recorded capacity of 10 MW, and has been generating since 2015-12-15.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-15
Solar Photovoltaics
Technology
BNRG (sold to another developer)
Chichester
Authority
England

Planning and build timeline

Application submitted2014-12-10
Permission granted2015-04-07
4 months after submission
Operational2015-12-15
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Chichester’s record on solar

Chichester has decided 24 solar farms and approved 88%, taking a median of 2.6 months. See every solar farm decision in Chichester

Other built sites within 15 km

SiteMWDistance
Bakers Farm (solar)
Solar Photovoltaics · Operational
121 km
Sefter Farm AD Plant (Farm AD)
Anaerobic Digestion · Operational
14.8 km
Park Farm
Solar Photovoltaics · Operational
57.2 km
Donaldsons Nursery, Marsh Farm - Solar Panels
Solar Photovoltaics · Under Construction
0.197.5 km
Merston Solar Park
Solar Photovoltaics · Operational
107.7 km
Tesco Superstore Shripney Road
Solar Photovoltaics · Operational
0.29.2 km
Manor Farm - Shripney
Solar Photovoltaics · Operational
59.6 km
Lidsey Landfill
Landfill Gas · Operational
1.410.3 km

How big is Land At Ferry Farm?

Land At Ferry Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land At Ferry Farm?

REPD records the operator as BNRG (sold to another developer). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land At Ferry Farm approved and built?

The application was submitted on 2014-12-10. Permission was granted on 2015-04-07, 4 months later. The site became operational on 2015-12-15, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4931.