Donaldsons Nursery, Marsh Farm - Solar Panels

Donaldsons Nursery, Marsh Farm - Solar Panels is under construction in Chichester with a recorded capacity of 0.19 MW.

0.19 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
The Summer Berry Company
Chichester
Authority
England

Planning and build timeline

Application submitted2022-10-28
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Chichester’s record on solar

Chichester has decided 24 solar farms and approved 88%, taking a median of 2.6 months. See every solar farm decision in Chichester

Other built sites within 15 km

SiteMWDistance
Merston Solar Park
Solar Photovoltaics · Operational
101.2 km
Park Farm
Solar Photovoltaics · Operational
52.8 km
Former Westhampnett Landfill
Solar Photovoltaics · Operational
7.52.9 km
Oving Solar Farm
Solar Photovoltaics · Operational
53.5 km
Sefter Farm AD Plant (Farm AD)
Anaerobic Digestion · Operational
13.7 km
Decoy Farm House Solar Modules
Solar Photovoltaics · Operational
64.1 km
Strettington Solar Farm
Solar Photovoltaics · Operational
54.2 km
Land at Tangmere Airfield
Solar Photovoltaics · Operational
54.4 km

How big is Donaldsons Nursery, Marsh Farm - Solar Panels?

Donaldsons Nursery, Marsh Farm - Solar Panels has a recorded installed capacity of 0.19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Donaldsons Nursery, Marsh Farm - Solar Panels?

REPD records the operator as The Summer Berry Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Donaldsons Nursery, Marsh Farm - Solar Panels approved and built?

The application was submitted on 2022-10-28. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12663.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council