Renewable sites › Donaldsons Nursery, Marsh Farm - Solar Panels
Donaldsons Nursery, Marsh Farm - Solar Panels
Donaldsons Nursery, Marsh Farm - Solar Panels is under construction in Chichester with a recorded capacity of 0.19 MW.
Planning and build timeline
| Application submitted | 2022-10-28 |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Chichester’s record on solar
Chichester has decided 24 solar farms and approved 88%, taking a median of 2.6 months. See every solar farm decision in Chichester →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Merston Solar Park Solar Photovoltaics · Operational | 10 | 1.2 km |
Park Farm Solar Photovoltaics · Operational | 5 | 2.8 km |
Former Westhampnett Landfill Solar Photovoltaics · Operational | 7.5 | 2.9 km |
Oving Solar Farm Solar Photovoltaics · Operational | 5 | 3.5 km |
Sefter Farm AD Plant (Farm AD) Anaerobic Digestion · Operational | 1 | 3.7 km |
Decoy Farm House Solar Modules Solar Photovoltaics · Operational | 6 | 4.1 km |
Strettington Solar Farm Solar Photovoltaics · Operational | 5 | 4.2 km |
Land at Tangmere Airfield Solar Photovoltaics · Operational | 5 | 4.4 km |
How big is Donaldsons Nursery, Marsh Farm - Solar Panels?
Donaldsons Nursery, Marsh Farm - Solar Panels has a recorded installed capacity of 0.19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Donaldsons Nursery, Marsh Farm - Solar Panels?
REPD records the operator as The Summer Berry Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Donaldsons Nursery, Marsh Farm - Solar Panels approved and built?
The application was submitted on 2022-10-28. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12663.
Novarly Parcel · official public data, read properly · parcel.novarly.com