Novarly ParcelRenewable sites

Renewable sitesKing Edwards School, North Road - Solar Panels

King Edwards School, North Road - Solar Panels

King Edwards School, North Road - Solar Panels is a 0.22 MW solar farm under construction in Bath and North East Somerset. REPD does not record the planning grant date. Operator of record: King Edwards School.

0.22 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
King Edwards School
Bath and North East Somerset
Authority
England

Planning and build timeline

Application submitted26 April 2023
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Bath and North East Somerset approves 76% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with King Edwards School, North Road - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bath and North East Somerset’s record on solar

Bath and North East Somerset has decided 17 solar farms and approved 76%, taking a median of 3.9 months. See every solar farm decision in Bath and North East Somerset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.9 km
Anaerobic Digestion · Under Construction
15.6 km
Solar Photovoltaics · Operational
58.2 km
Solar Photovoltaics · Operational
6.39.1 km
Solar Photovoltaics · Operational
510.2 km
Solar Photovoltaics · Operational
2010.3 km
Sewage Sludge Digestion · Operational
1.210.9 km
Solar Photovoltaics · Operational
0.2510.9 km

How big is King Edwards School, North Road - Solar Panels?

King Edwards School, North Road - Solar Panels has a recorded installed capacity of 0.22 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates King Edwards School, North Road - Solar Panels?

REPD records the operator as King Edwards School. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was King Edwards School, North Road - Solar Panels approved and built?

The application was submitted on 26 April 2023. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13882.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode