Kennoxhead Wind Farm

Kennoxhead Wind Farm is a 62 MW onshore wind farm under construction in Scotland. Planning permission was granted on 23 July 2015, 30 months after submission. Operator of record: Orsted Onshore Limited.

62 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Wind Onshore
Technology
Orsted Onshore Limited
National
Authority
Scotland

Planning and build timeline

Application submitted31 January 2013
Permission granted23 July 2015
30 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kennoxhead Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Scottish Government (S36)’s record on onshore wind

Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36)

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
665 km
Wind Onshore · Operational
366.4 km
Wind Onshore · Operational
7.86.6 km
Wind Onshore · Operational
7.86.6 km
Wind Onshore · Under Construction
1.67.7 km
Wind Onshore · Operational
267.8 km
Wind Onshore · Operational
488.3 km
Wind Onshore · Operational
519.1 km

How big is Kennoxhead Wind Farm?

Kennoxhead Wind Farm has a recorded installed capacity of 62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kennoxhead Wind Farm?

REPD records the operator as Orsted Onshore Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kennoxhead Wind Farm approved and built?

The application was submitted on 31 January 2013. Permission was granted on 23 July 2015, 30 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4385.