Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels is under construction in Rugby with a recorded capacity of 25 MW.

25 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Novus Renewable Services Limited
Rugby
Authority
England

Planning and build timeline

Application submitted2022-10-17
Permission granted2023-08-31
10 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rugby’s record on solar

Rugby has decided 19 solar farms and approved 95%, taking a median of 1.8 months. See every solar farm decision in Rugby

Other built sites within 15 km

SiteMWDistance
Coventry National Grid Substation
Battery · Operational
49.90.9 km
Coventry
EfW Incineration · Operational
4.57.4 km
Judkins Landfill Site Phase 3
Landfill Gas · Operational
1.28.4 km
Judkins Landfill Scheme
Landfill Gas · Operational
2.78.4 km
Land South of Pogmore Spinney
Solar Photovoltaics · Operational
510.9 km
Basin Bridge Farm
Solar Photovoltaics · Operational
511.7 km
Waverley Wood II
Landfill Gas · Operational
2.413.3 km
Ling Hall
Solar Photovoltaics · Operational
713.4 km

How big is Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels?

Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels has a recorded installed capacity of 25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels?

REPD records the operator as Novus Renewable Services Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels approved and built?

The application was submitted on 2022-10-17. Permission was granted on 2023-08-31, 10 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12597.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council