High Heavens Landfill

High Heavens Landfill is operational in Buckinghamshire with a recorded capacity of 1.9 MW, and has been generating since 2000-04-12.

1.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2000-04-12
Landfill Gas
Technology
Renewable Power Systems
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted1999-03-02
Permission granted1999-06-04
3 months after submission
Operational2000-04-12
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Derehams Farm, Derehams Lane - Battery Storage
Battery · Operational
407.3 km
Iomart, Clivemont Road - Solar Panels
Solar Photovoltaics · Operational
0.299.5 km
Wapsey's Wood
Landfill Gas · Operational
7.514.1 km
Wapsey's Wood II Landfill Site
Landfill Gas · Operational
114.1 km
Wapsey's Wood III
Landfill Gas · Operational
114.1 km
Fibrepower, Slough
EfW Incineration · Operational
5014.6 km
Slough Heat & Power Station
EfW Incineration · Under Construction
49.914.7 km

How big is High Heavens Landfill?

High Heavens Landfill has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates High Heavens Landfill?

REPD records the operator as Renewable Power Systems. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was High Heavens Landfill approved and built?

The application was submitted on 1999-03-02. Permission was granted on 1999-06-04, 3 months later. The site became operational on 2000-04-12, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 754.