Renewable sites › Inverfarigaig
Inverfarigaig
Inverfarigaig is an operational 4 MW hydro scheme in Highland, generating since 1 January 1980. REPD does not record the planning grant date. Operator of record: Green Power.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1 January 1980 |
Screening a site of your own?
Redline runs the record on your own boundary in Highland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Inverfarigaig’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Pumped Storage Hydroelectricity · Operational | 300 | 3.7 km |
Large Hydro · Operational | 5.2 | 4.3 km |
Small Hydro · Operational | 1.9 | 5.1 km |
Small Hydro · Operational | 3 | 7.4 km |
Wind Onshore · Operational | 110 | 10.2 km |
Small Hydro · Operational | 2 | 10.6 km |
Wind Onshore · Operational | 69.5 | 11.5 km |
Wind Onshore · Operational | 94 | 12.4 km |
How big is Inverfarigaig?
Inverfarigaig has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Inverfarigaig?
REPD records the operator as Green Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Inverfarigaig approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 January 1980.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 421.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode