Foyers is operational in Highland with a recorded capacity of 300 MW, and has been generating since 1974-01-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1974-01-01 |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Foyers Falls Large Hydro · Operational | 5.2 | 1 km |
Inverfarigaig Small Hydro · Operational | 4 | 3.7 km |
River E Hydro Scheme Small Hydro · Operational | 3 | 5.2 km |
Bhlaraidh (previously Balmacaan) Wind Onshore · Operational | 110 | 6.6 km |
River Coiltie Hydro Scheme Small Hydro · Operational | 1.9 | 7 km |
Garrogie Hydro Scheme Small Hydro · Operational | 2 | 7.7 km |
Livishie Large Hydro · Operational | 15 | 10 km |
Corriegarth Wind Onshore · Operational | 69.5 | 10.8 km |
How big is Foyers?
Foyers has a recorded installed capacity of 300 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Foyers?
REPD records the operator as SSE Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Foyers approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1974-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6842.