Inner Dowsing� is operational in DECC (S36) with a recorded capacity of 97.2 MW, and has been generating since 2008-04-20.

97.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2008-04-20
Wind Offshore
Technology
XceCo
DECC (S36)
Authority
England

Planning and build timeline

Application submitted2002-09-11
Permission granted2003-09-23
12 months after submission
Operational2008-04-20
55 months after consent

What this site sits on

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Centrica (Lincs)
Wind Offshore · Operational
2703.5 km
Lynn
Wind Offshore · Operational
97.25.8 km
Skegness Solar Park
Solar Photovoltaics · Operational
4.910.7 km
Race Bank (Phase 2)
Wind Offshore · Operational
283.511.2 km
Race Bank (Phase 1)
Wind Offshore · Operational
289.811.2 km
Westermost Rough A
Wind Offshore · Operational
21012.7 km
Dudgeon East�
Wind Offshore · Operational
40213.6 km
The Hollies
Wind Onshore · Operational
2.614.6 km

How big is Inner Dowsing�?

Inner Dowsing� has a recorded installed capacity of 97.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Inner Dowsing�?

REPD records the operator as XceCo. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Inner Dowsing� approved and built?

The application was submitted on 2002-09-11. Permission was granted on 2003-09-23, 12 months later. The site became operational on 2008-04-20, 55 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2491.