Renewable sitesRace Bank (Phase 1)

Race Bank (Phase 1)

Race Bank (Phase 1) is an operational 289.8 MW offshore wind farm in DECC (S36), generating since 8 June 2017. Planning permission was granted on 6 July 2012, 41 months after submission. Operator of record: Orsted (formerly Dong Energy)/ Macquarie Group.

289.8 MW
Capacity
as recorded in REPD
Operational
Status
since 8 June 2017
Wind Offshore
Technology
Orsted (formerly Dong Energy)/ Macquarie Group
DECC (S36)
Authority
England

Planning and build timeline

Application submitted23 January 2009
Permission granted6 July 2012
41 months after submission
Operational8 June 2017
59 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in DECC (S36): the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Race Bank (Phase 1)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Offshore · Operational
283.50 km
Wind Offshore · Operational
4022.6 km
Wind Offshore · Operational
2104.6 km
Wind Offshore · Operational
2708.1 km
Wind Offshore · Operational
97.29.2 km
Wind Offshore · Operational
97.211.2 km

How big is Race Bank (Phase 1)?

Race Bank (Phase 1) has a recorded installed capacity of 289.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Race Bank (Phase 1)?

REPD records the operator as Orsted (formerly Dong Energy)/ Macquarie Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Race Bank (Phase 1) approved and built?

The application was submitted on 23 January 2009. Permission was granted on 6 July 2012, 41 months later. The site became operational on 8 June 2017, 59 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2515.