Renewable sitesIBL Cold Stores - Solar Photovoltaics Panels

IBL Cold Stores - Solar Photovoltaics Panels

IBL Cold Stores - Solar Photovoltaics Panels is an operational 0.8 MW solar farm in Knowsley, generating since 1 November 2022. Planning permission was granted on 1 February 2022, 4 months after submission. Operator of record: IBL Cold Stores.

0.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 November 2022
Solar Photovoltaics
Technology
IBL Cold Stores
Knowsley
Authority
England

Planning and build timeline

Application submitted12 October 2021
Permission granted1 February 2022
4 months after submission
Operational1 November 2022
9 months after consent

Screening a site of your own?

RedlineUK · £39

Knowsley approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with IBL Cold Stores - Solar Photovoltaics Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Knowsley’s record on solar

Knowsley has decided 12 solar farms and approved 92%, taking a median of 1.7 months. See every solar farm decision in Knowsley

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.45.9 km
Landfill Gas · Operational
2.95.9 km
Solar Photovoltaics · Under Construction
0.636.8 km
Wind Onshore · Operational
17.8 km
Solar Photovoltaics · Operational
0.58.7 km
Battery · Under Construction
49.98.9 km
Landfill Gas · Operational
18.9 km
Battery · Operational
49.99.1 km

How big is IBL Cold Stores - Solar Photovoltaics Panels?

IBL Cold Stores - Solar Photovoltaics Panels has a recorded installed capacity of 0.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates IBL Cold Stores - Solar Photovoltaics Panels?

REPD records the operator as IBL Cold Stores. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was IBL Cold Stores - Solar Photovoltaics Panels approved and built?

The application was submitted on 12 October 2021. Permission was granted on 1 February 2022, 4 months later. The site became operational on 1 November 2022, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9845.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode