Wastewater Treatment Works, Fraserburgh is a 1.03 MW solar farm under construction in Aberdeenshire. Planning permission was granted on 15 December 2020, 3 months after submission. Operator of record: Scottish Water.

1.03 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Scottish Water
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted28 September 2020
Permission granted15 December 2020
3 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Aberdeenshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Wastewater Treatment Works, Fraserburgh’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Aberdeenshire’s record on solar

Aberdeenshire has decided 39 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
57.7 km
Solar Photovoltaics · Operational
1.67.7 km
Wind Onshore · Operational
2.48.5 km
Wind Onshore · Operational
1.611.7 km
Solar Photovoltaics · Under Construction
36.613.9 km
Battery · Under Construction
4013.9 km
Wind Onshore · Operational
4.614 km

How big is Wastewater Treatment Works, Fraserburgh?

Wastewater Treatment Works, Fraserburgh has a recorded installed capacity of 1.03 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wastewater Treatment Works, Fraserburgh?

REPD records the operator as Scottish Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wastewater Treatment Works, Fraserburgh approved and built?

The application was submitted on 28 September 2020. Permission was granted on 15 December 2020, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9523.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode