Novarly ParcelRenewable sites

Renewable sitesHarn Hill Quarry Landfill Site

Harn Hill Quarry Landfill Site

Harn Hill Quarry Landfill Site is operational in South Gloucestershire with a recorded capacity of 2.6 MW, and has been generating since 1996-10-01.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1996-10-01
Landfill Gas
Technology
Biogas Technology Ltd and Avon CC
South Gloucestershire
Authority
England

Planning and build timeline

Application submitted1995-07-06
Permission granted1995-09-25
3 months after submission
Operational1996-10-01
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Parklands
Solar Photovoltaics · Operational
4.64.6 km
Oakham Farm
Solar Photovoltaics · Operational
84.9 km
Land adjacent to Church Road
Solar Photovoltaics · Operational
3.55.5 km
Alveston Wind Park
Wind Onshore · Operational
6.96.7 km
Severnside Energy Recovery Centre
EfW Incineration · Operational
326.9 km
Sedbury Park
Solar Photovoltaics · Operational
57 km
Hammond Court Farm
Solar Photovoltaics · Operational
157.1 km
Rolls Royce Filton Campus Building 184
Solar Photovoltaics · Operational
1.47.4 km

How big is Harn Hill Quarry Landfill Site?

Harn Hill Quarry Landfill Site has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Harn Hill Quarry Landfill Site?

REPD records the operator as Biogas Technology Ltd and Avon CC. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Harn Hill Quarry Landfill Site approved and built?

The application was submitted on 1995-07-06. Permission was granted on 1995-09-25, 3 months later. The site became operational on 1996-10-01, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 722.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council