Greengairs Landfill Scheme Phase III is operational in North Lanarkshire with a recorded capacity of 2 MW, and has been generating since 1999-08-13.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 1999-08-13
Landfill Gas
Technology
Waste Recycling Group
North Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted1997-06-24
Permission granted1997-09-12
3 months after submission
Operational1999-08-13
23 months after consent

Other built sites within 15 km

SiteMWDistance
Greengairs Landfill Scheme Phase V
Landfill Gas · Operational
2.20 km
Greengairs Landfill Scheme Phase IV
Landfill Gas · Operational
20 km
Greengairs Landfill Scheme Phase II
Landfill Gas · Operational
1.90 km
Greengairs Landfill Scheme Phase VI
Landfill Gas · Operational
2.20 km
Avondale
Landfill Gas · Operational
40 km
Greengairs East Wind Farm
Wind Onshore · Operational
242.1 km
Greendykeside
Wind Onshore · Operational
42.7 km
Damhead Farm
Wind Onshore · Operational
2.55.7 km

How big is Greengairs Landfill Scheme Phase III?

Greengairs Landfill Scheme Phase III has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Greengairs Landfill Scheme Phase III?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Greengairs Landfill Scheme Phase III approved and built?

The application was submitted on 1997-06-24. Permission was granted on 1997-09-12, 3 months later. The site became operational on 1999-08-13, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 692.

Novarly Parcel · official public data, read properly · parcel.novarly.com