Avondale

Avondale is an operational 4 MW landfill gas site in North Lanarkshire, generating since 1 January 2006. Planning permission was granted on 29 January 2002, 3 months after submission. Operator of record: Shanks Avondale.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2006
Landfill Gas
Technology
Shanks Avondale
North Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted5 November 2001
Permission granted29 January 2002
3 months after submission
Operational1 January 2006
47 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Lanarkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Avondale’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.20 km
Landfill Gas · Operational
1.90 km
Landfill Gas · Operational
20 km
Landfill Gas · Operational
2.20 km
Landfill Gas · Operational
20 km
Wind Onshore · Operational
242.1 km
Wind Onshore · Operational
42.7 km
Wind Onshore · Operational
2.55.7 km

How big is Avondale?

Avondale has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Avondale?

REPD records the operator as Shanks Avondale. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Avondale approved and built?

The application was submitted on 5 November 2001. Permission was granted on 29 January 2002, 3 months later. The site became operational on 1 January 2006, 47 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 639.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode