Renewable sites › British Geological, Keywork Solar Panels
British Geological, Keywork Solar Panels
British Geological, Keywork Solar Panels is a 0.62 MW solar farm under construction in Rushcliffe. Planning permission was granted on 13 January 2021, 3 months after submission. Operator of record: British Geological Survey Head Office.
Planning and build timeline
| Application submitted | 28 October 2020 |
| Permission granted | 13 January 2021 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
Rushcliffe approves 90% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with British Geological, Keywork Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Rushcliffe’s record on solar
Rushcliffe has decided 30 solar farms and approved 90%, taking a median of 4.7 months. See every solar farm decision in Rushcliffe →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 4.9 | 4.7 km |
Biomass (dedicated) · Operational | 6.8 | 5.2 km |
Solar Photovoltaics · Operational | 5 | 5.6 km |
Solar Photovoltaics · Operational | 4.2 | 6.4 km |
Solar Photovoltaics · Operational | 6.1 | 7.8 km |
Battery · Operational | 0.5 | 7.8 km |
Anaerobic Digestion · Operational | 2 | 8.3 km |
Solar Photovoltaics · Operational | 0.18 | 8.4 km |
How big is British Geological, Keywork Solar Panels?
British Geological, Keywork Solar Panels has a recorded installed capacity of 0.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates British Geological, Keywork Solar Panels?
REPD records the operator as British Geological Survey Head Office. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was British Geological, Keywork Solar Panels approved and built?
The application was submitted on 28 October 2020. Permission was granted on 13 January 2021, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8222.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode