Novarly ParcelRenewable sites

Renewable sitesBritish Geological, Keywork Solar Panels

British Geological, Keywork Solar Panels

British Geological, Keywork Solar Panels is a 0.62 MW solar farm under construction in Rushcliffe. Planning permission was granted on 13 January 2021, 3 months after submission. Operator of record: British Geological Survey Head Office.

0.62 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
British Geological Survey Head Office
Rushcliffe
Authority
England

Planning and build timeline

Application submitted28 October 2020
Permission granted13 January 2021
3 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Rushcliffe approves 90% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with British Geological, Keywork Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rushcliffe’s record on solar

Rushcliffe has decided 30 solar farms and approved 90%, taking a median of 4.7 months. See every solar farm decision in Rushcliffe

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.94.7 km
Biomass (dedicated) · Operational
6.85.2 km
Solar Photovoltaics · Operational
55.6 km
Solar Photovoltaics · Operational
4.26.4 km
Solar Photovoltaics · Operational
6.17.8 km
Battery · Operational
0.57.8 km
Anaerobic Digestion · Operational
28.3 km
Solar Photovoltaics · Operational
0.188.4 km

How big is British Geological, Keywork Solar Panels?

British Geological, Keywork Solar Panels has a recorded installed capacity of 0.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates British Geological, Keywork Solar Panels?

REPD records the operator as British Geological Survey Head Office. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was British Geological, Keywork Solar Panels approved and built?

The application was submitted on 28 October 2020. Permission was granted on 13 January 2021, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8222.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode