British Geological, Keywork Solar Panels
British Geological, Keywork Solar Panels is under construction in Rushcliffe with a recorded capacity of 0.62 MW.
Planning and build timeline
| Application submitted | 2020-10-28 |
| Permission granted | 2021-01-13 3 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Rushcliffe’s record on solar
Rushcliffe has decided 30 solar farms and approved 90%, taking a median of 4.7 months. See every solar farm decision in Rushcliffe →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cotgrave solar farm Solar Photovoltaics · Operational | 4.9 | 4.7 km |
The Sawmill Biomass (dedicated) · Operational | 6.8 | 5.2 km |
Stragglethorpe Road farm Solar Photovoltaics · Operational | 5 | 5.6 km |
Radcliffe Solar Farm Solar Photovoltaics · Operational | 4.2 | 6.4 km |
GDL Wymeswold Solar Farm/land off the A6006 Solar Photovoltaics · Operational | 6.1 | 7.8 km |
Trent Basin Community Battery Battery · Operational | 0.5 | 7.8 km |
Colwick Industrial Estate (Farm and Food waste) Anaerobic Digestion · Operational | 2 | 8.3 km |
Eastcroft Municipal Depot Solar Photovoltaics · Operational | 0.18 | 8.4 km |
How big is British Geological, Keywork Solar Panels?
British Geological, Keywork Solar Panels has a recorded installed capacity of 0.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates British Geological, Keywork Solar Panels?
REPD records the operator as British Geological Survey Head Office. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was British Geological, Keywork Solar Panels approved and built?
The application was submitted on 2020-10-28. Permission was granted on 2021-01-13, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8222.