Novarly ParcelRenewable sites

Renewable sitesFormer Maghaberry Airfield

Former Maghaberry Airfield

Former Maghaberry Airfield is operational in Lisburn and Castlereagh with a recorded capacity of 25.7 MW, and has been generating since 2018-01-30.

25.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-01-30
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Lisburn and Castlereagh
Authority
Northern Ireland

Planning and build timeline

Application submitted2015-01-14
Permission granted2016-04-26
15 months after submission
Operational2018-01-30
21 months after consent

Lisburn and Castlereagh’s record on solar

Lisburn and Castlereagh has decided 6 solar farms and approved 100%, taking a median of 9.3 months. See every solar farm decision in Lisburn and Castlereagh

Other built sites within 15 km

SiteMWDistance
Ballinderry Road Solar Phase 1 (Lisburn)
Solar Photovoltaics · Operational
13.55.8 km
Land to the South of 15 Lough Road
Solar Photovoltaics · Operational
4.85.9 km
Hillside Solar Farm
Solar Photovoltaics · Operational
25.26.1 km
Ballinderry Road Solar Phase 2 (Lisburn)
Solar Photovoltaics · Operational
76.4 km
Moira Road
Solar Photovoltaics · Operational
6.511.3 km
Knockcairn Road
Solar Photovoltaics · Operational
6.511.5 km
Laurelhill
Solar Photovoltaics · Operational
8.512.5 km

How big is Former Maghaberry Airfield?

Former Maghaberry Airfield has a recorded installed capacity of 25.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Former Maghaberry Airfield?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Former Maghaberry Airfield approved and built?

The application was submitted on 2015-01-14. Permission was granted on 2016-04-26, 15 months later. The site became operational on 2018-01-30, 21 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4954.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council