Renewable sites › Moira Road
Moira Road
Moira Road is an operational 6.5 MW solar farm in Antrim and Newtownabbey, generating since 15 March 2017. Planning permission was granted on 3 December 2014, 6 months after submission. Operator of record: Lightsource Renewable Energy.
Planning and build timeline
| Application submitted | 27 May 2014 |
| Permission granted | 3 December 2014 6 months after submission |
| Operational | 15 March 2017 27 months after consent |
Screening a site of your own?
Antrim and Newtownabbey approves 83% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Moira Road’s recorded coordinate — swap in your own postcode or coordinates.
Antrim and Newtownabbey’s record on solar
Antrim and Newtownabbey has decided 12 solar farms and approved 83%, taking a median of 6.5 months. See every solar farm decision in Antrim and Newtownabbey →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 6.5 | 1.5 km |
Solar Photovoltaics · Operational | 25.2 | 5.3 km |
Solar Photovoltaics · Operational | 4.8 | 5.5 km |
Solar Photovoltaics · Operational | 10 | 5.8 km |
Solar Photovoltaics · Operational | 4.8 | 7 km |
Wind Onshore · Operational | 13.8 | 7.7 km |
Solar Photovoltaics · Operational | 6.5 | 10.1 km |
Solar Photovoltaics · Operational | 25.7 | 11.3 km |
How big is Moira Road?
Moira Road has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Moira Road?
REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Moira Road approved and built?
The application was submitted on 27 May 2014. Permission was granted on 3 December 2014, 6 months later. The site became operational on 15 March 2017, 27 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2324.