Novarly ParcelRenewable sites

Renewable sitesBallinderry Road Solar Phase 1 (Lisburn)

Ballinderry Road Solar Phase 1 (Lisburn)

Ballinderry Road Solar Phase 1 (Lisburn) is an operational 13.5 MW solar farm in Lisburn and Castlereagh, generating since 20 February 2017. Planning permission was granted on 11 November 2014, 4 months after submission. Operator of record: Hadstone Energy/Island Green Power.

13.5 MW
Capacity
as recorded in REPD
Operational
Status
since 20 February 2017
Solar Photovoltaics
Technology
Hadstone Energy/Island Green Power
Lisburn and Castlereagh
Authority
Northern Ireland

Planning and build timeline

Application submitted22 July 2014
Permission granted11 November 2014
4 months after submission
Operational20 February 2017
27 months after consent

Screening a site of your own?

RedlineUK · £39

Lisburn and Castlereagh approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ballinderry Road Solar Phase 1 (Lisburn)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Lisburn and Castlereagh’s record on solar

Lisburn and Castlereagh has decided 6 solar farms and approved 100%, taking a median of 9.3 months. See every solar farm decision in Lisburn and Castlereagh

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
70.9 km
Solar Photovoltaics · Operational
25.75.8 km
Solar Photovoltaics · Operational
25.27 km
Solar Photovoltaics · Operational
4.87.4 km
Solar Photovoltaics · Operational
6.511 km
Solar Photovoltaics · Operational
6.511.6 km
Solar Photovoltaics · Operational
1013.1 km

How big is Ballinderry Road Solar Phase 1 (Lisburn)?

Ballinderry Road Solar Phase 1 (Lisburn) has a recorded installed capacity of 13.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ballinderry Road Solar Phase 1 (Lisburn)?

REPD records the operator as Hadstone Energy/Island Green Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ballinderry Road Solar Phase 1 (Lisburn) approved and built?

The application was submitted on 22 July 2014. Permission was granted on 11 November 2014, 4 months later. The site became operational on 20 February 2017, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2236.