Ballinderry Road Solar Phase 2 (Lisburn)

Ballinderry Road Solar Phase 2 (Lisburn) is operational in Lisburn and Castlereagh with a recorded capacity of 7 MW, and has been generating since 2017-02-20.

7 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-02-20
Solar Photovoltaics
Technology
RAD Energy One/ Island Green Power
Lisburn and Castlereagh
Authority
Northern Ireland

Planning and build timeline

Application submitted2015-05-19
Permission granted2015-10-14
5 months after submission
Operational2017-02-20
16 months after consent

Lisburn and Castlereagh’s record on solar

Lisburn and Castlereagh has decided 6 solar farms and approved 100%, taking a median of 9.3 months. See every solar farm decision in Lisburn and Castlereagh

Other built sites within 15 km

SiteMWDistance
Ballinderry Road Solar Phase 1 (Lisburn)
Solar Photovoltaics · Operational
13.50.9 km
Former Maghaberry Airfield
Solar Photovoltaics · Operational
25.76.4 km
Hillside Solar Farm
Solar Photovoltaics · Operational
25.27.9 km
Land to the South of 15 Lough Road
Solar Photovoltaics · Operational
4.88.3 km
Knockcairn Road
Solar Photovoltaics · Operational
6.511.8 km
Moira Road
Solar Photovoltaics · Operational
6.512.4 km
Lands West of Belfast Road
Solar Photovoltaics · Operational
1013.7 km

How big is Ballinderry Road Solar Phase 2 (Lisburn)?

Ballinderry Road Solar Phase 2 (Lisburn) has a recorded installed capacity of 7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ballinderry Road Solar Phase 2 (Lisburn)?

REPD records the operator as RAD Energy One/ Island Green Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ballinderry Road Solar Phase 2 (Lisburn) approved and built?

The application was submitted on 2015-05-19. Permission was granted on 2015-10-14, 5 months later. The site became operational on 2017-02-20, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5331.