Renewable sites › Laurelhill
Laurelhill
Laurelhill is operational in Armagh City, Banbridge and Craigavon with a recorded capacity of 8.5 MW, and has been generating since 2018-03-01.
Planning and build timeline
| Application submitted | 2015-06-22 |
| Permission granted | 2016-05-24 11 months after submission |
| Operational | 2018-03-01 21 months after consent |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Reservoir Road (Farm AD) Anaerobic Digestion · Operational | 1.1 | 9.3 km |
Gilford Road Solar Photovoltaics · Operational | 1.3 | 9.8 km |
Portadown Road Battery · Under Construction | 50 | 11.4 km |
Former Maghaberry Airfield Solar Photovoltaics · Operational | 25.7 | 12.5 km |
How big is Laurelhill?
Laurelhill has a recorded installed capacity of 8.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Laurelhill?
REPD records the operator as BNRG Northern Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Laurelhill approved and built?
The application was submitted on 2015-06-22. Permission was granted on 2016-05-24, 11 months later. The site became operational on 2018-03-01, 21 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5952.
Novarly Parcel · official public data, read properly · parcel.novarly.com