Fairfield Farm is operational in Cumberland with a recorded capacity of 6.5 MW, and has been generating since 2011-03-02.

6.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-03-02
Wind Onshore
Technology
Windprospect
Cumberland
Authority
England

Planning and build timeline

Application submitted2006-09-29
Permission granted2008-05-20
20 months after submission
Operational2011-03-02
33 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on onshore wind

Cumberland has decided 38 onshore wind schemes and approved 66%, taking a median of 10.3 months. See every onshore wind scheme decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Potato Pot Wind Farm
Wind Onshore · Operational
62.9 km
Distington Landfill
Landfill Gas · Operational
1.82.9 km
Shearman Field
Landfill Gas · Operational
1.93.6 km
Lowca Wind Farm
Wind Onshore · Operational
4.73.9 km
Moorhouse Farm
Solar Photovoltaics · Operational
54 km
Winscales Phase I and II
Wind Onshore · Operational
8.85.7 km
Winscales Moor
Wind Onshore · Operational
67.2 km
Cleator
Battery · Operational
108.4 km

How big is Fairfield Farm?

Fairfield Farm has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fairfield Farm?

REPD records the operator as Windprospect. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fairfield Farm approved and built?

The application was submitted on 2006-09-29. Permission was granted on 2008-05-20, 20 months later. The site became operational on 2011-03-02, 33 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3613.