Novarly ParcelRenewable sites

Renewable sitesCleator

Cleator

Cleator is operational in Cumberland with a recorded capacity of 10 MW, and has been generating since 2018-01-08.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-01-08
Battery
Technology
Low Carbon Storage Investment Company/ VLC
Cumberland
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2018-01-08

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on battery storage

Cumberland has decided 11 battery storage schemes and approved 100%, taking a median of 4.2 months. See every battery storage scheme decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Fairfield Farm
Wind Onshore · Operational
6.58.4 km
Lowca Wind Farm
Wind Onshore · Operational
4.710.8 km
Potato Pot Wind Farm
Wind Onshore · Operational
611.2 km
Distington Landfill
Landfill Gas · Operational
1.811.3 km
Shearman Field
Landfill Gas · Operational
1.911.9 km
Moorhouse Farm
Solar Photovoltaics · Operational
512.3 km
Winscales Phase I and II
Wind Onshore · Operational
8.814.1 km

How big is Cleator?

Cleator has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cleator?

REPD records the operator as Low Carbon Storage Investment Company/ VLC. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cleator approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2018-01-08.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7177.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council