Novarly ParcelRenewable sites

Renewable sitesDistington Landfill

Distington Landfill

Distington Landfill is an operational 1.8 MW landfill gas site in Cumberland, generating since 1 December 1998. Planning permission was granted on 28 July 1994, 2 months after submission. Operator of record: Thomas Graveson Ltd.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 1998
Landfill Gas
Technology
Thomas Graveson Ltd
Cumberland
Authority
England

Planning and build timeline

Application submitted16 May 1994
Permission granted28 July 1994
2 months after submission
Operational1 December 1998
52 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Cumberland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Distington Landfill’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
60.5 km
Landfill Gas · Operational
1.90.6 km
Solar Photovoltaics · Operational
51.6 km
Wind Onshore · Operational
8.82.7 km
Wind Onshore · Operational
6.52.9 km
Wind Onshore · Operational
4.74 km
Wind Onshore · Operational
64.3 km
Wind Onshore · Operational
5.46.8 km

How big is Distington Landfill?

Distington Landfill has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Distington Landfill?

REPD records the operator as Thomas Graveson Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Distington Landfill approved and built?

The application was submitted on 16 May 1994. Permission was granted on 28 July 1994, 2 months later. The site became operational on 1 December 1998, 52 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 568.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode