Novarly ParcelRenewable sites

Renewable sitesCrowmarsh Battle Farm (Farm AD)

Crowmarsh Battle Farm (Farm AD)

Crowmarsh Battle Farm (Farm AD) is an operational 2.3 MW anaerobic digestion plant in South Oxfordshire, generating since 17 May 2013. Planning permission was granted on 30 March 2011, 9 months after submission. Operator of record: Severn Trent (formerly Agrivert).

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 17 May 2013
Anaerobic Digestion
Technology
Severn Trent (formerly Agrivert)
South Oxfordshire
Authority
England

Planning and build timeline

Application submitted15 June 2010
Permission granted30 March 2011
9 months after submission
Operational17 May 2013
26 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in South Oxfordshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Crowmarsh Battle Farm (Farm AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
2.40.7 km
Solar Photovoltaics · Operational
1.23.3 km
Solar Photovoltaics · Operational
2.45.8 km
Solar Photovoltaics · Operational
76.6 km
Solar Photovoltaics · Operational
21.37.3 km
Flywheels · Operational
40010.1 km
Landfill Gas · Operational
610.8 km
Landfill Gas · Operational
5.611.6 km

How big is Crowmarsh Battle Farm (Farm AD)?

Crowmarsh Battle Farm (Farm AD) has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crowmarsh Battle Farm (Farm AD)?

REPD records the operator as Severn Trent (formerly Agrivert). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crowmarsh Battle Farm (Farm AD) approved and built?

The application was submitted on 15 June 2010. Permission was granted on 30 March 2011, 9 months later. The site became operational on 17 May 2013, 26 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 386.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode