Dura Park Bynea Industrial Site

Dura Park Bynea Industrial Site is operational in Carmarthenshire with a recorded capacity of 1.4 MW, and has been generating since 2015-12-21.

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-21
Solar Photovoltaics
Technology
Short Bros Homes
Carmarthenshire
Authority
Wales

Planning and build timeline

Application submitted2015-10-22
Permission granted2015-12-15
2 months after submission
Operational2015-12-21
0 months after consent

Carmarthenshire’s record on solar

Carmarthenshire has decided 28 solar farms and approved 93%, taking a median of 4.8 months. See every solar farm decision in Carmarthenshire

Other built sites within 15 km

SiteMWDistance
Killan Farm Solar Array Extens
Solar Photovoltaics · Operational
15.5 km
Cockett Valley
Solar Photovoltaics · Operational
46.3 km
Gelliwern Isaf Farm
Solar Photovoltaics · Operational
67.6 km
Brynteg Farm
Solar Photovoltaics · Operational
16.27.9 km
Brynwhilach Solar Park
Solar Photovoltaics · Operational
49.3 km
Swansea Greener Grid Park
Battery · Under Construction
10.1 km
Pentre farm
Solar Photovoltaics · Operational
5.510.4 km
Abergelli Glas Solar Farm
Solar Photovoltaics · Operational
7.710.5 km

How big is Dura Park Bynea Industrial Site?

Dura Park Bynea Industrial Site has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dura Park Bynea Industrial Site?

REPD records the operator as Short Bros Homes. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dura Park Bynea Industrial Site approved and built?

The application was submitted on 2015-10-22. Permission was granted on 2015-12-15, 2 months later. The site became operational on 2015-12-21, 0 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5917.