Novarly ParcelRenewable sites

Renewable sitesBrynteg Farm

Brynteg Farm

Brynteg Farm is operational in Carmarthenshire with a recorded capacity of 16.2 MW, and has been generating since 2014-12-22.

16.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-12-22
Solar Photovoltaics
Technology
Brynteg Solar
Carmarthenshire
Authority
Wales

Planning and build timeline

Application submitted2013-09-19
Permission granted2014-03-11
6 months after submission
Operational2014-12-22
9 months after consent

Carmarthenshire’s record on solar

Carmarthenshire has decided 28 solar farms and approved 93%, taking a median of 4.8 months. See every solar farm decision in Carmarthenshire

Other built sites within 15 km

SiteMWDistance
Ffos Las Racecourse
Solar Photovoltaics · Operational
5.54.4 km
Pentre farm
Solar Photovoltaics · Operational
5.56.4 km
Pont Andrew Solar Farm
Solar Photovoltaics · Operational
1.57.5 km
Dura Park Bynea Industrial Site
Solar Photovoltaics · Operational
1.47.9 km
Clawdd Ddu PV
Solar Photovoltaics · Operational
13.511.6 km
Gelliwern Isaf Farm
Solar Photovoltaics · Operational
612.9 km
Pen Y Cae solar farm
Solar Photovoltaics · Operational
6.913.2 km
Killan Farm Solar Array Extens
Solar Photovoltaics · Operational
113.3 km

How big is Brynteg Farm?

Brynteg Farm has a recorded installed capacity of 16.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brynteg Farm?

REPD records the operator as Brynteg Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brynteg Farm approved and built?

The application was submitted on 2013-09-19. Permission was granted on 2014-03-11, 6 months later. The site became operational on 2014-12-22, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2363.