Ebbsfleet Farm Solar Farm

Ebbsfleet Farm Solar Farm is an operational 4.9 MW solar farm in Thanet, generating since 5 September 2011. Planning permission was granted on 18 March 2011, 2 months after submission. Operator of record: GKA Limited.

4.9 MW
Capacity
as recorded in REPD
Operational
Status
since 5 September 2011
Solar Photovoltaics
Technology
GKA Limited
Thanet
Authority
England

Planning and build timeline

Application submitted31 January 2011
Permission granted18 March 2011
2 months after submission
Operational5 September 2011
6 months after consent

Screening a site of your own?

RedlineUK · £39

Thanet approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ebbsfleet Farm Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Thanet’s record on solar

Thanet has decided 20 solar farms and approved 95%, taking a median of 2.3 months. See every solar farm decision in Thanet

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
2490.4 km
Battery · Operational
50.10.5 km
Battery · Operational
49.90.5 km
Solar Photovoltaics · Operational
50.8 km
Battery · Under Construction
49.91.1 km
Solar Photovoltaics · Operational
6.22.6 km
Solar Photovoltaics · Under Construction
332.6 km
Biomass (dedicated) · Operational
163.5 km

How big is Ebbsfleet Farm Solar Farm?

Ebbsfleet Farm Solar Farm has a recorded installed capacity of 4.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ebbsfleet Farm Solar Farm?

REPD records the operator as GKA Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ebbsfleet Farm Solar Farm approved and built?

The application was submitted on 31 January 2011. Permission was granted on 18 March 2011, 2 months later. The site became operational on 5 September 2011, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1041.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode